City Transit Systems

Malaysia is, for the most part, a car-dependent society.  However, it has made good progress over the last decade, including the commencement of the operation of its first Mass Rapid Transit (MRT) Line in Kuala Lumpur in 2016.   Kuching, where our headquarter is based, has launched its Kuching Urban Transportation System (KUTS) to ease congestion and improve connectivity within the Kuching City.  At the heart of KUTS is the trackless, hydrogen-powered Autonomous Rapid Transit (ART).  PPM is the project management partner of the joint venture who has been appointed as the Detailed Design Consultant (DDC) for the longest line (blue line) with 15 stops.
KUCHING URBAN TRANSPORTATION SYSTEM (KUTS)

 Project Management  |  Project Controls  |  Contract Management & Administration | Cost Management | Stakeholder Management  | Procurement Management

​Clie
nt: KTA Minsar KBCS JV PLT
Project Timing: 2022-2028

Sarawak Metro Sdn Bhd (SMSB) a wholly-owned subsidiary of Sarawak Economic Development Corporation (SEDC) has been entrusted by the Sarawak Government to transform the public road transport system in major urban areas. KUTS will serve as a backbone system to minimise and alleviate traffic congestion towards Kuching city centre. At the heart of the KUTS project is the trackless, hydrogen-powered Autonomous Rapid Transit (ART) system.

KTA Minsar KBCS JV PLT (KMKJV), consisting of KTA (Sarawak) Sdn Bhd, Jurutera Minsar Consult Sdn Bhd and Konsortium  Bumi Consultants and Services Sdn Bhd, has been appointed by SMSB as the Detailed Design Consultant (DDC1) for Blue Line with 15 stops, traversing from Rembus in Samarahan to Hikmah Exchange. KMKJV appointed PPM as the JV project manager to liaise and coordinate with SMSB, JV partners and sub-consultants to establish, execute, manage and monitor the project deliverables, project schedule, project cost and project requirements are in accordance to the Consultancy Services Agreement (CSA).
KLIA AND ASSOCIATED WORKS AT KLIA SEPANG, SELANGOR

Contract Management & Administration  |  Claims Identification & Preparation
​
​Client: 
UEMC-BinaPuri JV​
Project Timing: 2015-2016

UEMC-BinaPuri JV is a joint venture between UEM Construction Sdn Bhd (UEMC) and Bina Puri Sdn Bhd (Bina Puri).  The JV was awarded by Malaysia Airports Holdings Bhd (MAHB) as the main contractor to build KLIA2. 

Budgeted at approximately RM4 billion, it is the largest purpose-built terminal optimized for low-cost carriers in the region and was built in response to the exponential growth of low-cost travel in the region. It was built to replace the previous Low-Cost Carrier Terminal (LCCT).

Bina Puri appointed PPM to assist with contract management and claims, e.g. preparation of variation orders, extension of time applications and loss & expenses claims.


​